
Operating basis
- Operation type and rig model
- Description of the current handling sequence
- Target automation level and crew responsibilities
Geometry and tubular program
- Rig-floor or wellhead height
- Site layout with key horizontal distances
- Tubular OD, length and maximum single-joint weight
Controls and utilities
- Available hydraulic and electrical supply
- Local, wireless or integrated control requirements
- Communication protocol and signal-list expectations
- Hazardous-area and environmental requirements
Commercial and delivery information
- Required delivery date and destination
- Applicable documentation, inspection and acceptance requirements
- Installation, commissioning and training scope