
For demanding workover layouts
This system transfers tubing and drill pipe at heavy-workover sites, where platform height, load and distance to the well center require a larger handling envelope than light-workover equipment.
Site-specific geometry
The lifting geometry and pipe-rack arrangement are configured around the work platform, well center and loading side. Final values are confirmed after layout review.
Key features
- Configured for heavy-workover operations
- Two-way tubing and drill-pipe transfer
- Adaptable lifting geometry
- Hydraulic drive and remote operation
- Compatible with multi-level pipe-rack arrangements
Specifications
| Applicable platform height | 3.5–7.5 m |
|---|---|
| Well center to platform edge (loading side) | Up to 5 m |
| Rated lifting load | 500 kg |
| Handling cycle | 50 s |
| Rated hydraulic pressure | 10 MPa |
| Pipe-rack capacity | Three levels for 89 mm drill pipe |
| Total mass | 7,000 kg |
Delivery and support
- Layout and interface review
- Custom configuration proposal
- Factory testing
- Commissioning guidance
- Operator and maintenance training